Attaching Cost Codes to Sub Jobs

Updated by Cheryl Wallace

To add a cost code to a sub job, the cost code must already exist.

Cost Codes can only be attached to sub jobs. If you are only using a single level of jobs, consider either duplicating each job as its own sub job or grouping everything under a single top-level job.
  1. Click Utilities in the left side menu bar, then click Jobs.
  2. Click to expand the display the list of sub jobs for the Job Number.
  3. Click to the right the Sub Job Number.
  4. Select a Cost Code from the drop down list.
  5. Click to save the entry.