Editing a Requisition

Updated by Cheryl Wallace

Add or delete parts, or change the quantity required, or any other information before the transaction requisition (pick ticket) is approved. Once a requisition is approved, cancelled, or closed, the Part Numbers and Quantity cannot be changed.

  1. Look up the requisition to edit under Transactions > Requisitions.
  2. Make the required changes.
If a single line on the requisition is to be removed or cancelled, this line can be closed even if the requisition is approved. Click Closed to the right of the row on the Details tab and Save the change to the requisition. This prevents cancelling an entire requisition if there has been a change once the requisition document is created. If closing one or more line items leaves nothing to be received on the requisition, the requisition will be closed.
  1. Click to save the changes.